top of page
Review and evaluation of relevant information and documentation for the preparation of the Environmental Management Instrument for hydrocarbon activities in Block 64
This project consisted of carrying out an in-depth analysis of the existing environmental documentation in Block 64, the next project where Petroperú hopes to develop upstream activities (exploitation), in order to identify the possible environmental legal gaps in which they could be included in the process. of obtaining the environmental certification and prepare the guide for the preparation of the TDR for the Detailed Environmental Impact Study (EIAd) that must be prepared before the start of any activity in the area.
the-engineering-team-stands-beside-working-oil-pumps-with-sky
Image by Patrick Hendry
the-engineering-team-stands-beside-working-oil-pumps-with-sky
1/2
bottom of page